1/6 Site survey.
Your site survey is scheduled for:
November 4th, 2022.
During this visit our technician will check your roof, verify measurements, and adjust for shade and obstructions on your property. He or she will submit his or her findings to design department so they can create a customized system for you!
810 Mesa Loop
San Antonio, TX 78258.
![](https://powergyplus.com/wp-content/uploads/2022/11/pw-proposal-1.jpg)
Based on an annual period.
Track process.
![Site survey](https://powergyplus.com/wp-content/uploads/2022/11/powergy_track1.png)
![Design](https://powergyplus.com/wp-content/uploads/2022/11/powergy_track2.png)
![Permitting](https://powergyplus.com/wp-content/uploads/2022/11/powergy_track3.png)
![Installation](https://powergyplus.com/wp-content/uploads/2022/11/powergy_track4.png)
![Final inspection](https://powergyplus.com/wp-content/uploads/2022/11/powergy_track5.png)
![Permission to operate](https://powergyplus.com/wp-content/uploads/2022/11/powergy_track6.png)
Site survey
Our dedicated technician will visit the property to confirm the system design, verify measurements, and adjust for shade and obstructions on roof. After the site evaluation, a solar design expert will make any number of adjustments to the customized plan to ensure everything looks and operates perfectly.
From site visit to design, it can take between 3 to 5 weeks.
Design
Powergy+ will finalize your design plans. Once completed, plans will be submitted by Powergy+ to your local city government Authority Having Jurisdiction (AHJ) for permitting.
Permit approvals are subject to schedule of the AHJ.
Permitting
After design plans are finalized, they will be submitted by Powergy+ to the local city government Authority Having Jurisdiction (AHJ) for permitting. Permit approvals are subject to schedule of the governing AHJ Department.
This can take anywhere from 2 to 8 weeks.
Installation
After permit approval from the Jurisdiction and approval from CPS Energy, Powergy+ will contact the property owner to schedule installation. When our install team arrives, they will go over the design plans for final approval before they begin. Once the Powergy+ installation crew wraps up the job, they’ll finish by giving the property owner a full Solar 101 on the system.
Depending on the size of property and system, this phase takes 1 to 5 days.
Final inspection
There must be a final inspection by the city or county before the system can be connected to the grid.
Depending upon the time of install, the backlog of solar inspections, and the local government, the estimated time to complete this step is generally 1 to 4 weeks.
Permission to operate
Two things that need to happen before the system can produce electricity. First, Powergy+ will submit the documents to the utility company to connect to the grid. This usually takes 1 to 2 weeks. Second, the utility company has to install a new meter to track how much energy your solar produces. Once this has been completed, your utility will grant PTO (Permission to Operate) which means your system can be turned on.
Powergy+ will have little control over how long this step is going to take.
Project information.
General
Registration: 10/10/2022
Partner: Gonzalo Sanchez
Notes: –
Payment
Deal type: Financing
Initial Down Payment: 10%
Period: 7 years
Installation
Inverter: Solaredge
Structure: Everest
Accesories: –